Aller directement au contenu principal

Guide d'auto-installation de Warehouse

Table des matières


Composants pour l'installation

Warehouse_Install_Image.png

Aperçu de la surveillance de la température

1598642500992-2.png


Every warehouse has unique monitoring requirements. This section describes the general premise, but your monitoring equipment may look different from what is shown here.

A) Dry Storage

Verify the temperature and humidity of sensitive products to ensure the highest quality.

B) Refrigerators and Freezers

Receive real-time alerts whenever cold storage inventory or equipment has a temperature excursion.

C) Gateways

All of our gateway products are plug-and-play. Once installed in an area with good cellular coverage, they will automatically pair with sensors and report to the dashboard.

D) Dashboard

Provides real-time oversight of product temperatures for visibility into compliance and reefer performance to identify risks.


Warehouse Installation Planning

The first step in warehouse deployment is sourcing a warehouse layout schematic. Using the schematic, SmartSense will collaborate with you to scope the gateway and sensor locations. The map will guide the installer on the appropriate locations for the hardware. A standard application will consist of 10 temperature monitoring points. Typically, cooler and freezer zones are deployed, while ambient zones are optional.

Sample warehouse map:

1598642518359-3.png

Please follow the installation guidelines for your specific gateway.


Installation de la passerelle BZ

  1. Retirez la passerelle BZ de son emballage.

    helpjuice_production_uploads_upload_image_3604_direct_1607107702562-Screen_Shot_2020-12-04_at_1.32.50_PM__2_.png
  2. Branchez la passerelle BZ sur une prise prévue à cet effet pour la charger. La prise ne doit pas être commutée. La passerelle BZ doit toujours rester connectée à l'alimentation CA en fonctionnement normal.

    helpjuice_production_uploads_upload_image_3604_direct_1607107792462-IMG_0848.jpeg

    Note : Votre passerelle BZ peut avoir besoin d'être chargée pendant 30 minutes avant de passer à l'étape 4.

  3. Branchez l'adaptateur d'alimentation sur la passerelle BZ, en exerçant une force suffisante pour assurer un ajustement par friction. Tirez doucement sur le câble de l'adaptateur d'alimentation pour vous assurer que la connexion est bien établie. L'alimentation en courant alternatif est indiquée par le voyant bleu situé à côté du connecteur de l'adaptateur d'alimentation.

    cordon d'alimentation.jpg
  4. Utilisez le mode de recherche de signal (SFM) sur la passerelle BZ pour déterminer un emplacement d'installation avec la meilleure force de signal cellulaire.

    signal finder mode.png



    a) To enter Signal Finder Mode, hold the power button for 3-4 seconds then release the button.

    b) A white LED will flash repeatedly to indicate you are in Signal Finder Mode.

  5. Pour obtenir la meilleure connectivité, déplacez la passerelle BZ sur le lieu d'installation jusqu'à ce que le voyant blanc commence à clignoter rapidement (un voyant rouge clignotant indique un mauvais signal cellulaire). La puissance maximale du signal est représentée par un clignotement du voyant blanc toutes les 200 ms (plus le voyant blanc clignote rapidement, plus le signal cellulaire est puissant).

  6. Une fois qu'un bon emplacement a été trouvé, appuyez rapidement sur le bouton d'alimentation et relâchez-le pour quitter le mode de recherche de signaux.

  7. Fixez les bandes Velcro fournies aux quatre coins de l'arrière de la passerelle BZ.

  8. En cas d'installation sur du métal, des murs en béton ou toute autre surface poreuse susceptible de retenir l'humidité, installez la passerelle BZ à l'aide du support et des vis de montage (SKU : TM-GW-VZ-VZW-C, disponible sur demande).

  9. Installez la passerelle BZ sur une surface murale propre, à six pieds du sol, en appuyant fermement l'appareil contre le mur pour s'assurer que le velcro adhère complètement.

  10. Une fois la passerelle BZ installée, utilisez des supports de câbles et des attaches zip pour gérer proprement le câblage et éviter les accrochages ou les dommages à la passerelle BZ.

  11. Reportez-vous au guide d'état des DEL ci-dessous pour confirmer que la passerelle BZ communique.

  1. Retirez la passerelle BZ et le support de montage de leur emballage respectif.

  2. Insérez les vis à oreilles fournies à l'arrière de la passerelle BZ.

    BZ_Gateway_Mounting_Bracket-04.png
  3. En utilisant le support de montage comme guide, marquez et percez deux trous dans le mur.

    • Faites attention à la surface dans laquelle vous percez et à ce qui peut se trouver derrière.

    • Ces étapes ne doivent être effectuées qu'après avoir confirmé la disponibilité de l'alimentation électrique, du signal cellulaire et de l'état de l'appareil pour tous les capteurs associés.

      BZ_Gateway_Mounting_Bracket-01.png
  4. À l'aide d'un marteau, enfoncez les chevilles dans les trous jusqu'à ce qu'elles affleurent le mur.

  5. Installez le support de montage au mur à l'aide des vis fournies.

    BZ_Gateway_Mounting_Bracket-03.png
  6. Attach the BZ Gateway to the bracket by inserting it from the top and sliding down to seat the BZ Gateway into the indent on the bracket.

    BZ_Gateway_Mounting_Bracket-05.png
  7. The mounting bracket is magnetic and may also be installed on a rack or shelf using zip ties.

    BZ_Gateway_Mounting_Bracket-06.png

Guide de référence des LED

Guide de référence des LED

Guide de référence des LED

Guide de référence des LED

Statut

LED blanche

LED rouge

Description

Mise sous tension

-

1 long flash LED blanc

Dernier téléchargement réussi

-

1 bref clignotement de la LED blanche toutes les 30 secondes

Pile faible

-

1 bref clignotement de la DEL blanche suivi d'un bref clignotement de la DEL rouge, toutes les 30 secondes

Pile faible empêchant la communication

-

-

1 bref clignotement de la LED rouge, toutes les 30 secondes

Signal cellulaire faible

--

1 bref clignotement de la DEL blanche suivi de 2 brefs clignotements de la DEL rouge, toutes les 30 secondes

Pas de signal cellulaire

-

--

2 brefs clignotements de la DEL rouge, toutes les 30 secondes

Contacter le service d'assistance de SmartSense

-

---

3 brefs clignotements de la LED rouge, toutes les 30 secondes

Défaillance du matériel

-

•••••••

LED rouge clignotant en continu


Installation du capteur Z

Identify the area that you want to monitor. You should have completed the site survey as part of the gateway installation. Be sure that your sensors and gateway will be within range of each other by installing the gateway as close to the sensors as possible.

  1. Install your Z Sensors in the most at-risk area that you are monitoring.

    This is an example of a typical walk-in freezer

    1598643256593-12-Z_Sensor_Install_3.png
  2. Install the Z Sensor at least 3 feet from the door opening. The Z Sensor should be located near the product level, and above the height of moving racks.

  3. If you are monitoring an ambient area, place the sensor higher as heat rises.

  4. Quickly press the power button on the Z Sensor and Z Screen to turn the devices on.

    1598643196225-5.png
  5. Three LED lights will display on the Z Sensor, indicating it has powered on, then go out.

  6. If communicating correctly, the device will display no LED lights, but a green LED light will flash, followed by a yellow LED flash every few minutes.

  7. Once powered on, the Z Screen will pair with the Z Sensor that was associated during manufacturing.

    Note: This may take up to 5 minutes.

  8. Once paired, the Z Screen will show the serial number of its paired Z Sensor, as well as the current temperature reading.

  9. If your Z Sensor and Z Screen do not pair, scroll down to the section "Pairing a Z Screen with a Z Sensor."

  10. To install your Z Sensor, locate the current thermometer in each area and place the Z Sensor in the same vicinity.

    Screen_Shot_2021-06-07_at_1.18.08_PM.png
  11. Ensure the Z Sensor is not directly touching or surrounded by the product.

  12. The Z Screen is magnetic and should be mounted to the outside of the freezer door.

  13. Using the Install Sheet, note the Z Sensor ID (ex. 1166600000012345678) and the Asset Name of the unit that the Z Sensor is being installed into (this will be needed to complete the setup of SmartSense reporting).


Associer un écran Z à un capteur Z

  1. Your Z Sensor should have arrived from the factory pre-paired. Quickly hit the power button on the Z Screen to search for its paired sensor. If this doesn't work or if the Z Sensor and Z Screen become un-paired, follow steps 2-6.

  2. Appuyez sur le bouton d'alimentation de l'écran Z et maintenez-le enfoncé jusqu'à ce que vous entendiez deux séries de bips distincts, puis relâchez-le. Il se peut que vous deviez porter l'écran Z à votre oreille pour entendre les bips. Si vous ne les entendez toujours pas, essayez de maintenir le bouton enfoncé pendant environ 6 secondes, puis relâchez-le.

    1595360752670-Z_Screen_Onlt.png
  3. The Z Screen display should show a message indicating it has entered "Pairing Mode."

    1595360815197-PG9-1.png
  4. Prenez le capteur Z et appuyez rapidement sur le bouton d'alimentation. Les voyants s'allument puis s'éteignent. Le voyant vert commence à clignoter, indiquant que le capteur recherche une connexion.

    1595360829046-PG9-2_copy.png
  5. You'll know the Z Screen and Z Sensor are paired when the Z Screen displays the temperature. Confirm the Z Screen is paired with the correct Z Sensor by matching the 20-digit number located on the Z Screen and the barcode sticker on the side of the Z Sensor.

    1595360842500-PG9-3_copy.png
  6. You can switch from a Fahrenheit display to Celsius by holding the Z Screen power button for 3 seconds, or until you hear a beep, and let go.


Optional: NIST/Humidity Probe Installation

  1. Pour installer ou remplacer une sonde NIST ou une sonde d'humidité, dévissez le capuchon de protection ou la sonde existante dans le sens inverse des aiguilles d'une montre et jetez-la.

    1598643521863-Sensor_1.png
  2. Pour connecter une nouvelle sonde NIST, alignez la flèche de la sonde NIST sur la flèche du port dont vous venez de retirer l'ancienne sonde. Il y a cinq broches sur le capteur Z et cinq trous sur la sonde NIST qui correspondent.

    1598643536600-Sensor_2_copy.png
  3. Gently screw the NIST probe into the same port in a clockwise direction. Do not use excessive force, as this can damage the pins. Only the spinning connector piece should rotate, not the entire NIST probe.

    1598643550651-Sensor_2.png

Remarque : les sondes NIST doivent être installées sur le port 1, sauf si les broches du port 1 ont été pliées, auquel cas la sonde NIST peut être installée sur le port 2.


Installation du capteur B2

B2 Sensor - Labeled.png



SmartSense B2 Sensors offer a variety of features. Installing in a warehouse is very similar for all models, or the condition that is being monitored.

SmartSense B2 Sensors ship from the factory already powered and in broadcast mode, so there is no need to power them on.

  1. Identify the area that you want to monitor. You should have completed this site survey as part of the gateway installation. Be sure that your sensors and gateway will be within range of each other by installing the gateway as close to the sensors as possible.

  2. Install the B2 Sensors in the most at-risk area that you are monitoring.

    • If you are mounting in a refrigerator, place the sensor near the door as this will be the warmest area.

    • If you are monitoring an ambient area for temperature, place the sensor higher as heat rises.

    • If you are monitoring an ambient area for humidity only, place the sensor in the middle of the area being monitored.

  3. Using the Install Sheet, note the B2 Sensor ID (ex. B0000000) and the Asset Name of the unit that the B2 Sensor is being installed into (this will be needed to complete the setup of SmartSense reporting).

  4. Use the included zip tie to attach the B2 Sensor to a secure mounting point. This can be a shelf or other fixture that does not move. Ensure that the B2 Sensor is hanging free and is not surrounded tightly by products or other items that might distort the temperature reading.

  5. After completing your sensor installation, allow 30 minutes for the sensors to propagate and begin reporting. Login to SmartSense and confirm that all B2 Sensors are communicating.


Install Sheet Download

You can access a downloadable PDF version of the Install Sheet here.

Cela a-t-il répondu à votre question ?